The Highland Lakes of Texas
Email list
endurable-critic
Spurs info Billing Department News Department News Editor Obituaries Advertising Department Discussion Forum

Go Back   The Highland Lakes of Texas » Forums > News > Regional News


Reply
 
Thread Tools Display Modes
Old 02-11-2013, 10:54 AM   #1
Newsbot
Rechargeable News Robot
 
Join Date: Aug 2009
Posts: 4,840
Traffic switching to new U.S. 281 bridge in Marble Falls on Feb. 11

http://www.dailytrib.com/2013/02/11/...alls-on-feb-11
FROM STAFF REPORTS

MARBLE FALLS Generations have crossed the U.S. 281 bridge in Marble Falls, but Feb. 11 is the last day the iconic landmark will be open before all traffic switches to the new structure.

Construction crews will begin to switch all lanes of traffic to the new bridge at 6 p.m., according to Texas Department of Transportation spokesperson Kelli Reyna.

Reyna said by the morning of Feb. 12 all four lanes of traffic will be on the new bridge.

The lane change will allow crews to begin the demolition process of the old bridge. How it will be demolished is still being reviewed.

TxDOT, the Texas Parks and Wildlife Department and the Lower Colorado River Authority are working to determine if the bridge will be demolished with explosives or taken down piece by piece.

Once the old structure is demolished, crews will begin building the second section of the new bridge, which is scheduled for completion in the fall of 2014.

editor@thepicayune.com
Newsbot is offline   Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 04:26 AM.

Aardvarks are cool


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.
Jett Fuel Productions, LLC - All Rights Reserved